Skip to main content

Your Technologies &
Energy Efficiency Partner
Call 1800 778 823

Bamstone Green Energy Solar Installation Case Study

Bamstone is Australia's largest stone processing facility, based in Port Fairy. With rising energy tariffs a concern, Bamstone took a proactive approach in reducing costs by committing to a three stage Green Energy program.

The core goal was to substantially lower the carbon footprint of the main processing plant. Working with Middy’s Warrnambool, the TechEnergy team proposed an LED Lighting upgrade and installed a 100 Kilowatt+ solar panel system on the factory's roof space resulting in approximately 35% of Bamstone's Factory being supplied by Green Energy. The Middy's TechEnergy solution aimed to maximise Bamstone's return on investment and provide an effective energy cost reduction strategy.