Skip to main content

Your Technologies &
Energy Efficiency Partner
Call 1800 778 823

Membrey Farm Solar Power Install Case Study

The Middy’s TechEnergy Team delivered a Solar Energy Install at the Membrey Dairy Farm in Warrnambool. The install supports a commitment to reducing Greenhouse Gas Emissions and creates a sustainable financial model to mitigate rising power costs.

The 176.8kW turnkey rooftop solar installation and 530kW/h onsite battery storage results in significant cost savings and offsets power price hikes. consume 28.7 MWh, a huge improvement over the old Halide Highbays which consumed 86.6 MWh, resulting in an annual energy saving of 66% for the Wagga Wagga plant.